Eye Link Belt Production Process and Quality Control
18 pages · flip through online · tap the right half for the next page

What you will find in this book
Gate 01 · Raw material incoming inspectionWire coils are checked on arrival and stored by batch.Open page 2 →
Gate 02 · Rod & bar link QA inspectionLink width, wire diameter and rod diameter measured.Open page 3 →
Gate 03 · Component assembly checkBar links and washers checked, then the assembled belt.Open page 4 →
Gate 04 · Final QA inspection before shipmentEye-link pitch, wire and link diameter, rod diameter and bar link thickness measured; edge and surface finish, intermediate chain, wear plates, groove-type structure and flights checked.Open page 5 →
Gate 05 · Sprocket check & running testStainless and plastic sprockets checked and run with the belt to confirm engagement.Open page 11 →
Gate 06 · Packing for shipmentBelt rolls marked, packed with their sprockets and crated for export.Open page 13 →
QC record templateProject reference, belt type, material, width and length, one result line for each gate, and signature fields for approval and for the buyerOpen page 17 →About this document
This 18-page book shows how the JBL Mesh Belt Eye Link Belt is checked: the 6 inspection gates from raw material incoming inspection to packing for shipment, with the QC record template at the end.
Links, rods, washers, edges and sprockets are all checked, and the sprockets are run with the belt before packing.
The photos show the checks being made. Readings visible in them are examples from individual projects, not specifications; each belt is checked against its confirmed project drawing.
Eye Link Belt: inspection gates
| Gate | What is checked | Pages |
|---|---|---|
| 01 · Raw material incoming inspection | Wire coils are checked on arrival and stored by batch. | 2 |
| 02 · Rod & bar link QA inspection | Link width, wire diameter and rod diameter measured. | 3 |
| 03 · Component assembly check | Bar links and washers checked, then the assembled belt. | 4 |
| 04 · Final QA inspection before shipment | Eye-link pitch, wire and link diameter, rod diameter and bar link thickness measured; edge and surface finish, intermediate chain, wear plates, groove-type structure and flights checked. | 5–10 |
| 05 · Sprocket check & running test | Stainless and plastic sprockets checked and run with the belt to confirm engagement. | 11–12 |
| 06 · Packing for shipment | Belt rolls marked, packed with their sprockets and crated for export. | 13–16 |
From the JBL Mesh Belt production process and quality control book (without-equipment version). Readings in the photos are project examples; your belt is checked against your confirmed drawing. See page 17 →
Questions this document answers
+Which inspection gates does the Eye Link Belt quality control book show?
6 gates: raw material incoming inspection; rod & bar link QA inspection; component assembly check; final QA inspection before shipment; sprocket check & running test; packing for shipment (pages 2–16).
+Is the sprocket run with the eye link belt before shipment?
Yes. Gate 05 checks the sprockets and runs them with the belt to confirm engagement (pages 11–12).
+What is checked in the final inspection?
Eye-link pitch, wire and link diameter, rod diameter, bar link thickness, edge and surface finish, and any intermediate chain, wear plates, groove-type structure or flights (Gate 04, pages 5–10).
+What does the QC record template include?
Project reference, belt type, material, width and length, one result line for each gate, and signature fields for approval and for the buyer (page 17).
+What should I send to review this process against my project?
Photos of your current belt and its edge, or your drawing. Email info@jblmeshbelt.com or WhatsApp +86 138 1487 2506 (page 18).
How is a Eye Link Belt checked before it ships?
This 18-page process book follows the belt through 6 inspection gates, from raw material incoming inspection to packing for shipment, and ends with the QC record template.
Each gate shows what is measured or checked at that stage, so you can see what to ask for in your own inspection plan.
Send us photos of your current belt, equipment drawings and the product you need to convey, and we will confirm which checks apply to your project.



