Self-Stacking Belt Production Process and Quality Control

20 pages · flip through online · tap the right half for the next page

What you will find in this book

About this document

This 20-page book shows how the JBL Mesh Belt Self-Stacking Belt is checked: the 6 inspection gates from raw material incoming inspection to packing for shipment, with the QC record template at the end.

It ends with a stacking and straightness test — the check closest to how a self-stacking belt behaves on the equipment.

The photos show the checks being made. Readings visible in them are examples from individual projects, not specifications; each belt is checked against its confirmed project drawing.

Self-Stacking Belt: inspection gates

GateWhat is checkedPages
01 · Raw material incoming inspectionStainless wire coils checked and batch-tagged by specification.2
02 · Spiral wire QA inspectionWire diameter, spiral thickness and spiral pitch measured with a digital caliper.3
03 · Belt geometry checkDrum diameter test and tape measurement of the turning geometry.4
04 · Assembly & dimension checkRod diameter, spiral pitch, wire diameter, rod pitch, side plate thickness and height and overall width measured; heavy-duty belts included.5–10
05 · Stacking and straightness testBelt stacked tier on tier to check engagement, then checked along a straight edge.11–15
06 · Packing for shipmentFlat-packed, then crated, strapped and labelled.16–18

From the JBL Mesh Belt production process and quality control book (without-equipment version). Readings in the photos are project examples; your belt is checked against your confirmed drawing. See page 19 →

Questions this document answers

+Which inspection gates does the Self-Stacking Belt quality control book show?

6 gates: raw material incoming inspection; spiral wire QA inspection; belt geometry check; assembly & dimension check; stacking and straightness test; packing for shipment (pages 2–18).

+How is stacking checked before a self-stacking belt ships?

Gate 05 stacks the belt tier on tier to check engagement and then checks straightness along a straight edge (pages 11–15).

+Which dimensions are measured on the assembled belt?

Rod diameter, spiral pitch, wire diameter, rod pitch, side plate thickness and height, and overall width (Gate 04, pages 5–10).

+What does the QC record template include?

Project reference, belt type, material, width and length, one result line for each gate, and signature fields for the QC inspector and an authorized buyer representative (page 19).

+What should I send to review this process against my project?

Photos of the stacking area and side plates of your current belt, or your drawing. Email info@jblmeshbelt.com or WhatsApp +86 138 1487 2506 (page 20).

How is a Self-Stacking Belt checked before it ships?

This 20-page process book follows the belt through 6 inspection gates, from raw material incoming inspection to packing for shipment, and ends with the QC record template.

Each gate shows what is measured or checked at that stage, so you can see what to ask for in your own inspection plan.

Send us photos of your current belt, equipment drawings and the product you need to convey, and we will confirm which checks apply to your project.